Friday, April 30, 2021 - Safford, AZ

The conduit for the electric and the pipe for the water were both buried today!  This means we are one step closer to moving out to the property.

The electrical pole will right about where the stake is laying on the ground.  Currently the conduit has gray tape over the hole until the pole and wiring are in place.

The electric meter pedestal for us is over where Mike is standing.  It was approximately a 140' run.
We will have a well sharing agreement with our neighbor Dave.  He had a 1-1/4" water line run to the property line, so we just had to extend it from the property line to where we wanted the water service. 

The water spigot is over by the electrical panel.  It was a longer run.
So now we have water and septic and a electrical panel.  No electricity yet.  Now, we have to wait for the electric company to come out, inspect and approve the work, and install the meter.